What to do with a wooden floor in Khrushchev?

Good day! I have the usual two-room Khrushchev (it was closed for 10 years), which is in dire need of repair. Especially in a deplorable state, wooden floors. I am not a great specialist in this matter, we can say that it is a complete amateur, but not in the sense of skills in general, but in the sense of the device of sex. Hence the question: will it be logical to replace wooden floors with a concrete screed, on which a laminate board coating will then be laid? Or it would be more reasonable to cover the existing wooden floor with plywood, on top of which the laminate will be laid. If you still have to remove everything, then how to arrange waterproofing in the simplest way?

Although you say that you have never encountered a device of sexual construction, but both of the methods you have proposed have a rational grain. We advise that at least partially remove the boardwalk, this will allow you to plan further actions.

Option number 1

But first, you should carefully evaluate the situation once again: the state of the topmost coating is very important. If it is so dilapidated that it cannot be restored, then it is definitely subject to removal. If the defects are partial, then it makes sense to partially repair the plank floor:

  • Seal cracks and seams between the boards.
  • Fix defective floorboards with self-tapping screws.
  • Lay waterproof plywood.
  • Lay the substrate under the laminate.
  • Apply laminate flooring.

Option number 2

If nevertheless there is no point in repairing, then we remove the boards. Most likely, under them you will find construction debris - it was he who in the old days served as a sound insulator. But underneath it should be made concrete screed, most likely in a far from ideal condition. In this case, the procedure for further actions is as follows:

  1. The concrete base is thoroughly cleaned of any debris, for the purpose of disinfection (due to the decay of the building) it is processed, for example, with bleach.
  2. The surface is primed.
  3. A layer of waterproofing is laid (which you will find in the store).
  4. Self-leveling screed is poured.
  5. The finish coating is laid.

This is one of the options for arranging the floor in the apartment, in order to get acquainted with other technologies, we suggest that you familiarize yourself with the materials on our site dedicated to floor repair.